Views: 7775 Author: Site Editor Publish Time: 2019-04-14 Origin: Site
Main application of UHMWPE sheet - ship, marine, ultra-high coal bunker lining, can be used as coal bunker lining in ship cabin, hopper lining, dredger chain bucket lining, can make the cargo ship self-unloading system normal It can be rotated to prevent obstruction from arching, and improve the unloading speed by more than 30%. Stern tube bearings, etc.
Coal, mines - This product can be used as belt conveyor skirts, coal bunker linings, spiral conveying equipment protection edges and linings, coal chute linings, rotating roller sleeves, etc.
Thermal power generation - This product can be used as coal bunker lining board, fly ash discharge pipeline and valve, main shaft bushing and blade of concentration tank, high molecular polyethylene coal bunker lining board, high pressure nozzle and so on.
Wheels, rollers
It is suitable to be used as a roller or as an outer bushing of a metal roller for conveying guide rollers, reverse rollers and traveling rollers. Compared with other materials, it has a longer service life, is easy to process, and has less refueling times, and does not leak oil, rust, oil and rust stains and will not stain fibers.
Other aspects
Such as: mixer supporting wheel, valve body, valve core washer, insulating sleeve, guide plate, pulley, etc., in the railway field, there are moving axle box liner, moving wheel spring suspension sleeve, retaining ring, cross head slipper, rocker small end Small square tiles, etc., in the shipbuilding industry, there are bearings, water pump bearings, pulley sliders, sprockets, handle anti-electricity, seals and so on.
When installing the coal bunker lining board, when the operation or ambient temperature changes greatly, the fixed form of the lining board must consider its free expansion or contraction. Any fixing method, coal bunker lining, should be designed to facilitate the flow of bulk material, and the screw head female is always buried in the lining. For thicker liners, the seam should be cut at 45 degrees. In this way, variations in length are allowed, and a smooth plastic plane is formed in the silo, which is conducive to the flow of materials. Pay special attention when installing the coal bunker lining: 1. During the installation process, the bolt countersunk head plane of the lining must be exactly the same as the board surface; 2. When installing the coal bunker lining product, there should be no less than 10 bolts per square meter; 3. The gap between each lining board should not be greater than 0.5cm (the installation should be adjusted according to the ambient temperature of the board);