Views: 16425 Author: Site Editor Publish Time: 2006-04-01 Origin: Site
Polyethylene silo liner UHMWPE Tivar Liner
In what environment is the coal bunker liner used and what are the installation and use methods?
Construction steps of coal bunker lining :
1. Use a hanging cage to hang it into the raw coal bunker to check and confirm the falling off of the liner.
2. Clean up the pulverized coal in the raw coal bunker and set up scaffolding.
3. After the coal bunker linings are laid, fill the gaps between the linings of each coal bunker with glue hooks.
4. Evenly spread the prepared glue on the inner wall of the raw coal bunker, and lay the coal bunker linings one by one until the end.
5. Use an angle grinder to polish the places where the coal bunker lining plate falls off seriously, and expose the metallic luster, and prepare for laying the coal bunker lining plate.