Safety Plastic Crane Outrigger Pads / Mobile Poly Composite Crane Outrigger Pads

Size:
Color:
Availability:
Quantity:

Safety Plastic Crane Outrigger Pads / Mobile Poly Composite Crane Outrigger Pads Application :

Langrui Truck Crane  Outrigger Pads Foot Support Plate put under the support-leg Truck Crane, Crawler Crane, Rough Crane, Boom Pump, Concrete Pump, Fire Truck, Utility Truck, Tree Trimmer, Any type of Aerial Equipment and so on, for making the machine work safely.


Safety Plastic Crane Outrigger Pads / Mobile Poly Composite Crane Outrigger Pads :

  • Lightweight, 1/7th The Weight Of Steel

  • Withstands Loads Up To 3000 psi

  • Retains Its Physical Properties To -80°c

  • Will Not Corrode, Rot, Or Rust

  • High Impact & Wear Resistance

  • Can Withstand Over 1,000,000 Lbs Of Compressive Load


The following points need to be paid attention to when working with the Safety Plastic Crane Outrigger Pads / Mobile Poly Composite Crane Outrigger Pads :

1. First, select the appropriate size pad according to the weight of the vehicle, the contact area and the grounding position to prevent the outrigger from sinking during operation.


2. Before placing the outrigger, pay attention to hang the parking brake and pull out the outrigger fixing pin.


3. Construction vehicles should not be erected too high, and it is usually advisable to have the tires off the ground a little.


4. When erecting outriggers, attention should be paid to make the reference plane of the slewing bearing level, so that the inclination of the slewing bearing surface is not more than 1/1000 (the level bubble is centered) when there is no load.


5. If there is also an engine on the crane, after the outriggers are placed, the engine should be turned off and the power take-off should be placed in the neutral position.


6. After placing the outriggers, check the grounding condition of the vertical outriggers again, and there should be no three-point phenomenon, so as to ensure that the outriggers are sufficiently safe.


7. When lifting, do not turn the handle of the outrigger control valve. If you need to adjust the outriggers, you must place the heavy object on the ground, and the boom is located in the lower front or lower rear, and then adjust.